bathroom renovation.co.nzGet matched

The case studies

Recent jobs.
Final NZD.

Six renovations from the last twelve months — each tied to a named renovator on the directory and a final figure that includes GST. No before-photo flattery; the maths shows up.

Scope 01

Refresh

$16.8k

Average across 1 job

Scope 02

Mid-scope retile

$39.6k

Average across 1 job

Scope 03

Full reno

$88.3k

Average across 4 jobs

03Full reno11 weeks

A 1968 Devonport bathroom, opened up to the sea-light

Removed a non-load-bearing wall to put the basin under a refurbished steel-frame window. New plumbing rough-in, framed-in shower niche, brushed brass tapware, terrazzo-look porcelain.

Region

Auckland

Owner

Tessa & Mark, Devonport

Final cost

$78.4k

02Mid-scope retile6 weeks

A Mt Victoria bungalow retile, no layout changes, six weeks

Stripped to framing, full BRANZ-compliant rebuild, kept the basic 2x2 layout that worked. The point was the membrane — there was a slow leak.

Region

Wellington

Owner

Sam, Mt Victoria

Final cost

$39.6k

01Refresh3 weeks

A Riccarton rental, refresh-tier, in seventeen days

Rental property between tenants. New vanity, new toilet, regrout, repaint, new mixer, new lighting. The shower and tile stayed because they were sound.

Region

Christchurch

Owner

Property investor, Riccarton

Final cost

$16.8k

03Full reno9 weeks

Adding a second bathroom in a Pāpāmoa townhouse

Carved a 2.4 x 1.6m powder-and-shower out of an under-stair storage space. New rough-in, structural lintel, a Velux skylight for ventilation and light.

Region

Tauranga

Owner

The Lepou-Singh family, Pāpāmoa

Final cost

$64.2k

03Full reno8 weeks

An off-shore-owned alpine ensuite, in eight weeks

Total ensuite rebuild for an absentee Australian owner. Heated stone floor, double-glazed wet-room window, freight surcharges baked in. Project run end-to-end with no on-site visits from the owner.

Region

Queenstown

Owner

Owner offshore, Frankton chalet

Final cost

$92.5k

03Full reno14 weeks

A 1920s Cashmere villa master ensuite, slow-built

Stripped a clumsy 1990s ensuite back to the original timber and rebuilt it as architecture. Custom joinery, hand-glazed tile, deliberate slow build over four months.

Region

Christchurch

Owner

Phillipa & Andrew, Cashmere

Final cost

$118k

Want a transformation
like one of these?

Tell us which case study most resembles your job. We’ll match you with the renovator who built it, plus one or two others in your region for comparison.

Get matched